Scope overview: Grow-out pond erosion solution including supply and installation of precast concrete tilt panels
Project Profile: Download PDF

Project Description

Petuna engaged Wiley to provide a safe and cost-effective design to stop the continuous erosion of the clay earth embankments.  The project involved supply and installation of new structurally-engineered precast concrete wall panels, forming a solid wall face to each side of the existing clay earth pond walls.  Upgrades were also carried out on an existing cross over bridge, enabling the feed truck to access the ponds safely.